Toms River Regional Schools: Share the Vision!
AdministrationNews & NotesCurriculumLibrarySchoolsCalendarStaff ResourcesTechnologyDirectoryE-Mail


FACELIFT AT HIGH SCHOOL EAST
Friday, November 14, 2008

High School East enjoyed a facelift of the front exterior of the school.  Trees were removed and new landscaping was installed.  Students also enjoyed a new seating and picnic area for them to eat at during their lunch period.

 

The front of High School East before the renovation.
 

Trees were removed from the front of the school.

 

The ground was grated, leveled, and prepared for irrigation.
 

The old sidewalks were removed.

 

New top soil was brought in and new sidewalks were poured.
 

Sod was laid with the new sprinkler system in place.
 

A patio and seating wall were constructed.
 

Trees were planted and mulch was used.
 

A picnic and lunch area was placed for students.
 

Decorative landscaping was placed in front.
 

High School East students enjoying lunch
outside in the new picnic area.